Armstrong In The Media

Case study: INOX Leisure Limited

Posted by Armstrong Fluid Technology on Nov 24, 2023 9:30:00 AM

Inox, a leader in India’s Cinema exhibition industry, started a journey of energy conservation and carbon footprint reduction in its Laserplex theaters. Armstrong helped inox replace four constant-speed pumps with three Design Envelope pumps and changed the system to use primary-variable control. 

Read More

Topics: Energy Saving, Energy Upgrade, Case Study, In The Media

Case study: Brant Haldimand Norfolk Catholic District School Board

Posted by Armstrong Fluid Technology on Nov 21, 2023 2:19:25 PM

 

Design Envelope technology is an intelligent, connected solution that tracks actual system conditions, and dynamically adjusts equipment operation. Pump Manager, a cloud-based service that leverages the intelligence of Design Envelope pumps, allows operators and managers to actively manage the performance of an HVAC system.

Read More

Topics: Energy Saving, Energy Upgrade, Energy - saving pumps, In The Media

Case study: Zheng Zhou University

Posted by Armstrong Fluid Technology on Nov 7, 2023 4:09:48 PM

Armstrong pumps were selected as part of a retrofit for this administrative building at Zheng Zhou University. Though the university administrators were primarily interested in a chiller upgrade, they opted to upgrade to Design Envelope pumps for the potential energy savings.

Read More

Topics: Energy Saving, Energy Upgrade, In The Media

Case study: Delta Hotel

Posted by Armstrong Fluid Technology on Sep 29, 2023 9:53:07 AM

Delta Hotels Toronto is one of the largest, most luxurious hotels in Canada and is rated as one of the most sustainable. Delta commissioned an upgrade of one of their existing pumps to a new Design Envelope Tango. Energy savings post-installation have proven that the Tango pump was the right choice.

Read More

Topics: Energy Saving, Energy Upgrade, Case Study, In The Media

Armstrong Announces New Features for Its Award-winning Pump Manager solution

Posted by Armstrong Fluid Technology on Sep 22, 2021 5:48:45 AM

As Seen On:empoweringpumps.com September 15, 2021

 

Armstrong Fluid Technology has announced new features for calculating and tracking energy-savings that are now available with its Pump Manager asset management solution.

Read More

Topics: Energy Upgrade, In The Media, Pump Manager

Armstrong Receives Two Prestigious Awards from One of Brazil’s Top HVACR Associations

Posted by Armstrong Fluid Technology on Dec 9, 2019 9:42:29 AM

As Seen On: news.thomasnet.com December 03, 2019

Armstrong Fluid Technology has been honored by the Sheet Metal and Air Conditioning Contractors National Association (SMACNA) of Brazil with prestigious industry awards for its key role in two major projects.

SMACNA recognized Armstrong with its New Project of the Year Award for the company’s involvement with the Patteo Shopping Mall in Olinda, Pernambuco, Brazil. The company was also one of the recipients of SMACNA’s Retrofit (Energy Upgrade) Project of the Year Award for its contributions to the Hotel Unique retrofit project in Sao Paulo, Brazil.

Read More

Topics: Awards, Design Envelope, Energy Upgrade, Retrofit, In The Media

Armstrong Fluid Technology shares how innovation in HVAC can save energy and deliver on sustainability goals.

Posted by Armstrong Fluid Technology on Dec 9, 2019 8:47:34 AM

As Seen On: usgbc.org December 04, 2019

Did you know that it’s possible to save up to 40 cents per square foot, while reducing the timeline to reach your sustainability goals by a third?

There are few building systems that can have such a dramatic impact on tenant productivity, quality of life, operating efficiency and business sustainability as the HVAC system. Performance drift in HVAC systems is a common issue that leads to wasted energy and increase in greenhouse gas (GHG) emissions. According to the International Energy Agency, the construction and operation of buildings is responsible for over 39% of energy-related GHG emissions, a large part of which can be attributed to inefficient HVAC technologies.

Read More

Topics: Design Envelope, Energy Saving, Energy Upgrade, Sustainability, In The Media, Energy Efficiency

Data collection

Posted by Armstrong Fluid Technology on Oct 4, 2019 6:16:18 AM

As Seen as  meuc.co.uk (page no 26): September 2019   

 

Valuable collection

Data collection and communication by individual devices is a powerful weapon in the battle for energy efficiency. Energy Upgrade Leader at Armstrong Fluid Technology, Jason Cox, shows how pumps can lead the charge.

Pump technology can play a significant part in industry’s bid to rein in energy use. Through data analytics and automation, pumps can optimise efficiency by reacting swiftly to changes in demand. A vital design consideration that is key in this role is decentralised data collection – the collection of data from energy-using devices
themselves, rather than simply metering energy usage across a site.

Read More

Topics: Design Envelope, Energy Upgrade, HVAC System, In The Media, Energy Efficiency

Charles Armstrong sees the company as a technology-based solutions provider for its worldwide customers

Posted by Armstrong Fluid Technology on Jun 26, 2019 10:02:30 AM

As Seen on pmengineer.com - June 14, 2019

BNP Media Plumbing Group Editorial Director Mike Miazga sat down with Armstrong Fluid Technology Chairman and CEO Charles Armstrong during the 2019 ISH show in Frankfurt. During the chat, Armstrong talked about the family-owned company's continued evolution, its continued push into international markets and what the future holds for the designer, engineer and manufacturer of intelligent fluid-flow equipment.
 
Read More

Topics: Energy Upgrade, HVAC System, In The Media, ISH 2019, BNP Media, ISH

Cutting the Cost of Inaction

Posted by Andrew Boothroyd on Apr 1, 2019 2:48:29 AM

It is time to rethink how energy upgrade projects should be managed. It frequently takes as long as a year and a half to reach the implementation stage of a capital expenditure energy saving project. Typically, the first 6 months are spent collecting data, months 6 to 9 involve a data analysis phase, then technology solutions and a business plan are developed in months 9 to 12. Over the next 6 months stakeholders make their decisions until (18 months after initial discussions) the project is implemented. During that year and a half, not a single kW of energy is saved. With the latest generation of Armstrong Design Envelope (DE) pump technology, however, building owners and occupiers could be saving energy from day 1, month 1 of the initial discussions.

Read More

Topics: Design Envelope, Energy Upgrade, In The Media, Active Performance Management

Never miss a thing!

Be the first to get notified

Sign up for our blog notifications and you will be one of the first to know when there is new content. If you want to be in the know, sign up now.

Sign up for notifications now

Recent Posts

Posts by Topic

see all