It is time to rethink how energy upgrade projects should be managed. It frequently takes as long as a year and a half to reach the implementation stage of a capital expenditure energy saving project. Typically, the first 6 months are spent collecting data, months 6 to 9 involve a data analysis phase, then technology solutions and a business plan are developed in months 9 to 12. Over the next 6 months stakeholders make their decisions until (18 months after initial discussions) the project is implemented. During that year and a half, not a single kW of energy is saved. With the latest generation of Armstrong Design Envelope (DE) pump technology, however, building owners and occupiers could be saving energy from day 1, month 1 of the initial discussions.
Topics: Design Envelope, Energy Upgrade, In The Media, Active Performance Management
Armstrong Fluid Technology - AHR Expo 2019 New Product Announcements
As Seen on Supply House Times - March 13, 2019
Topics: Compass R, Design Envelope, In The Media, Tango, Compass R SS, AHR2019
Armstrong Fluid Technology brings highest energy efficiency with lowest installation and operating cost solutions to ISH 2019
As Seen on empoweringpumps.com - March 13, 2019
Armstrong Fluid Technology is excited to be exhibiting at ISH 2019, the world’s leading trade fair focusing on the responsible management of water and energy in buildings, located at the Frankfurt Fair and Exhibition Centre. Located at stand A68 in hall 9.0 the Armstrong booth includes a range of the most innovative, high value solutions available in the industry. Armstrong’s fluid flow and control portfolio for commercial and domestic customers provide the highest energy efficiency and redundancy while offering solutions with the lowest installation cost, lowest operating cost and the lowest environmental impact.
Topics: Design Envelope, Parrallel Sensorless Pump Controller, ifms, In The Media, Pump Manager, Tango, ISH 2019, PSPC
Armstrong Unveils New IPS 4000 Controller for Multi- pump Installations with Variable Load Demands
As Seen on heatinghelp.com - March 05, 2019
Armstrong Fluid Technology has announced the release of its new Integrated Pumping System (IPS 4000), an automation solution for commercial HVAC pumping stations of up to 8 pumps and 16 zones.
The new IPS 4000:
- Automates and optimizes multi-pump installations in a range of different plant configurations
- Provides sequences for variable-primary, secondary or tertiary pumping system applications
- Delivers leading energy savings, with patented Parallel SensorlessTM pump staging technology
Topics: Design Envelope, In The Media, IPS 4000, Integrated Pumping System
As Seen on contractormag.com - February 14, 2019
Armstrong Fluid Technology announced the availability of a new capability on all of its Design Envelope solutions. All Design Envelope pumps will have the capability to predict and detect cavitation in a pump, and deliver an alert to a previously established contact. The ability to detect cavitation and provide an alert will limit the energy losses and equipment damage.
Topics: AHR Expo, Design Envelope, In The Media, AHR2019
Armstrong’s Pump Manager, an Active Performance Management™ Service, Now Detects and Reports Cavitation
As Seen on empoweringpumps.com - January 15, 2019
Armstrong Fluid Technology is pleased to announce the availability of a new capability on all of our Design Envelope solutions.
Effective immediately, Design Envelope pumps will have the capability to predict and detect cavitation in a pump, and deliver an alert to a previously established contact.
Topics: Design Envelope, In The Media, Pump Manager, Active Performance Management
As Seen on contractormag.com - January 13, 2019
THE COMPASS R CIRCULATOR by Armstrong Fluid Technology features advanced variable-speed Design Envelope technology, new high-efficiency Armstrong iECM motors, quadratic pressure curves, multiple control options, a replaceable mechanical seal, bolt-for-bolt connection compatibility with a range of installed three-piece circulators, large wiring chamber, release latch for easy adjustment of the display orientation as well as repair, and easy-to-access front-facing terminal block. It is available in .25 horsepower to 1.5 horsepower models with a maximum flow rate of 225 gpm and maximum head of 65’.
Also Seen On
- phcppros.com - January 25, 2021
- especificarmag.com.mx - June 10, 2022
- especificarmag.com.mx - June 10, 2022
Topics: Compass R, Design Envelope, In The Media
Reducing Energy Use with Intelligent Devices and Performance Management
As Seen on empoweringpumps.com - January 2019
Topics: Design Envelope, Empowering Pumps, Performance Management
Armstrong Announces Three New Energy Saving Focused Webinars for HVAC Professionals
As Seen on empoweringpumps.com - December 14, 2018
Armstrong Fluid Technology has announced a new series of webinars focused on energy savings to help building managers, engineers and other industry professionals get the best performance from their HVAC systems.
The first of the three complimentary webinars “Massive Energy Savings –Performance Management for your HVAC System” takes place on December 14th. This session will explain how Performance Management in HVAC systems can minimize efficiency loss and avoid additional energy costs. Register here.
Topics: Design Envelope, Energy Saving, In The Media
Armstrong To Showcase Performance Upgrade Program for Installed Design Envelope Pumps at AHR Expo 2019
As Seen on heatinghelp.com - December 05, 2018
Armstrong Fluid Technology will showcase a new Performance Upgrade Program for installed Design Envelope pumps at AHR Expo 2019 January 14-16 in Atlanta.
The Performance Upgrade Program provides an opportunity to upgrade existing Design Envelope pumps to include advanced control features and connectivity to Pump Manager, an IoT enabled analytics solution. Pump Manager connects operators to Design Envelope pumps, providing real-time insights based on operating data.
Topics: AHR Expo, Design Envelope, In The Media, AHR2019, Controller Upgrade



