As seen on elco.co.uk - December 1, 2014
ELCO UK has supplied four R3604 gas-fired condensing boilers to Armstrong Fluid Technology, as part of a 4,000kW low temperature hot water (LTHW) packaged plant room. The containerised system has been installed at Chelsea FC’s training ground in Cobham, serving the under pitch heating coils.
The floor standing R3604 boilers were specified by Richard Jackson, Senior Mechanical Engineer at the Anslow Partnership. Commenting on the project and ELCO UK, he said: “Chelsea FC has a policy to keep energy use to a minimum and is very conscious of the environment, so the R3604 boilers were chosen because of their high efficiency and class-leading low NOx levels.