Armstrong In The Media

Cutting the Cost of Inaction

Posted by Andrew Boothroyd on Apr 1, 2019 2:48:29 AM

It is time to rethink how energy upgrade projects should be managed. It frequently takes as long as a year and a half to reach the implementation stage of a capital expenditure energy saving project. Typically, the first 6 months are spent collecting data, months 6 to 9 involve a data analysis phase, then technology solutions and a business plan are developed in months 9 to 12. Over the next 6 months stakeholders make their decisions until (18 months after initial discussions) the project is implemented. During that year and a half, not a single kW of energy is saved. With the latest generation of Armstrong Design Envelope (DE) pump technology, however, building owners and occupiers could be saving energy from day 1, month 1 of the initial discussions.

Read More

Topics: Design Envelope, Energy Upgrade, In The Media, Active Performance Management

Armstrong Fluid Technology - AHR Expo 2019 New Product Announcements

Posted by Armstrong Fluid Technology on Mar 27, 2019 6:24:13 AM

As Seen on Supply House Times - March 13, 2019

Read More

Topics: Compass R, Design Envelope, In The Media, Tango, Compass R SS, AHR2019

Armstrong Fluid Technology brings highest energy efficiency with lowest installation and operating cost solutions to ISH 2019

Posted by Armstrong Fluid Technology on Mar 27, 2019 5:52:06 AM

As Seen on empoweringpumps.com - March 13, 2019

 

 

Armstrong Fluid Technology is excited to be exhibiting at ISH 2019, the world’s leading trade fair focusing on the responsible management of water and energy in buildings, located at the Frankfurt Fair and Exhibition Centre. Located at stand A68 in hall 9.0 the Armstrong booth includes a range of the most innovative, high value solutions available in the industry. Armstrong’s fluid flow and control portfolio for commercial and domestic customers provide the highest energy efficiency and redundancy while offering solutions with the lowest installation cost, lowest operating cost and the lowest environmental impact.

Read More

Topics: Design Envelope, Parrallel Sensorless Pump Controller, ifms, In The Media, Pump Manager, Tango, ISH 2019, PSPC

Armstrong Unveils New IPS 4000 Controller for Multi- pump Installations with Variable Load Demands

Posted by Armstrong Fluid Technology on Mar 7, 2019 10:01:09 AM

As Seen on  heatinghelp.com - March 05, 2019

Armstrong Fluid Technology has announced the release of its new Integrated Pumping System (IPS 4000), an automation solution for commercial HVAC pumping stations of up to 8 pumps and 16 zones.

The new IPS 4000:

  • Automates and optimizes multi-pump installations in a range of different plant configurations
  • Provides sequences for variable-primary, secondary or tertiary pumping system applications
  • Delivers leading energy savings, with patented Parallel SensorlessTM pump staging technology
Read More

Topics: Design Envelope, In The Media, IPS 4000, Integrated Pumping System

AHR Expo 2019

Posted by Armstrong Fluid Technology on Feb 21, 2019 6:28:56 AM


Earlier this year Armstrong Fluid Technology was an exhibitor at AHR Expo 2019, the world’s largest HVACR event. It was a very busy three days of product demonstrations, networking, and idea sharing. The entire event was documented by numerous industry publications. Below is a summary of items related to Armstrong Fluid Technology.

Read More

Topics: AHR Expo, Events, In The Media, AHR2019, Active Performance Management, Adept Select

Best of AHR 2019

Posted by Armstrong Fluid Technology on Feb 18, 2019 8:30:45 AM

As Seen on contractormag.com - February 14, 2019

 

Armstrong Fluid Technology announced the availability of a new capability on all of its Design Envelope solutions. All Design Envelope pumps will have the capability to predict and detect cavitation in a pump, and deliver an alert to a previously established contact. The ability to detect cavitation and provide an alert will limit the energy losses and equipment damage. 

Read More

Topics: AHR Expo, Design Envelope, In The Media, AHR2019

Armstrong’s Pump Manager, an Active Performance Management™ Service, Now Detects and Reports Cavitation

Posted by Armstrong Fluid Technology on Feb 18, 2019 4:18:42 AM

As Seen on  empoweringpumps.com - January 15, 2019

Armstrong Fluid Technology  is pleased to announce the availability of a new capability on all of our Design Envelope solutions.

Effective immediately, Design Envelope pumps will have the capability to predict and detect cavitation in a pump, and deliver an alert to a previously established contact.

Read More

Topics: Design Envelope, In The Media, Pump Manager, Active Performance Management

Designing Parallel Pumping Systems - Webinar

Posted by Armstrong Fluid Technology on Feb 11, 2019 4:37:20 AM

As Seen on empoweringpumps.com - February 2019

 

March 5 @ 11:00 am - 12:00 pm

 

This session will show you how Parallel Sensorless technology for HVAC systems can help reduce energy consumption and installation costs.

Presented by David Lee, Vice-Chair of ASHRAE Technical Committee 6.1 – Hydronic and Steam Equipment and Systems. David was also nominated for Empowering Pumps’ Pump Person of the Year in 2017.

Read More

Topics: webinar, HVAC, In The Media, Parallel Pumping Systems

Armstrong’s New Active Performance Management™ Solution Saves over 40% on HVAC System-wide

Posted by Armstrong Fluid Technology on Feb 11, 2019 2:44:28 AM

As Seen on empoweringpumps.com - January 2019

Armstrong Fluid Technology  is pleased to announce Active Performance ManagementTM, an important advancement in HVAC efficiency. Active Performance Management is Patented onboard software that learns predicts, adjusts automatically and makes optimization recommendations in real-time. Applied in conjunction with equipment upgrades and consulting services, Active Performance Management has been shown to improve energy efficiency in HVAC systems by over 40%.

Read More

Topics: In The Media, Active Performance Management

COMPASS R Circulator

Posted by Armstrong Fluid Technology on Feb 11, 2019 2:16:11 AM

As Seen on contractormag.com - January 13, 2019


 

THE COMPASS R CIRCULATOR by Armstrong Fluid Technology features advanced variable-speed Design Envelope technology, new high-efficiency Armstrong iECM motors, quadratic pressure curves, multiple control options, a replaceable mechanical seal, bolt-for-bolt connection compatibility with a range of installed three-piece circulators, large wiring chamber, release latch for easy adjustment of the display orientation as well as repair, and easy-to-access front-facing terminal block. It is available in .25 horsepower to 1.5 horsepower models with a maximum flow rate of 225 gpm and maximum head of 65’.

Also Seen On 

Read More

Topics: Compass R, Design Envelope, In The Media

Never miss a thing!

Be the first to get notified

Sign up for our blog notifications and you will be one of the first to know when there is new content. If you want to be in the know, sign up now.

Sign up for notifications now

Recent Posts

Posts by Topic

see all